A complete M&E building-services installation across every core discipline — electrical, mechanical and heating, ventilation, lighting and solar PV — delivered to an occupied-school programme.
A new primary school and nursery required its full suite of building services delivered as a single, coordinated package — with the added constraint of a live school programme where safety, noise and access around pupils and staff had to be managed at every turn.
Rather than split the electrical, mechanical and renewable elements across separate trades, the project was placed with Stein Group to self-deliver the lot. One team, one design intent, one accountable partner from first fix to final certificate.
Our directly-employed engineers installed the complete electrical infrastructure — LV distribution, lighting and controls, containment and small power — alongside the mechanical and heating systems and a fresh-air ventilation strategy sized for busy classrooms.
A rooftop solar PV array was integrated into the design from the outset, giving the school a tangible route to lower energy cost and carbon in daily operation. Every system was commissioned, tested and certified in-house, so the handover pack came from the same people who built the installation.
A fully coordinated, low-carbon-ready school handed over safe, tested and certified — with the renewable generation working from day one and every discipline traceable to a single point of accountability. The kind of clean, single-source delivery that only a genuinely multi-discipline contractor can offer.
Design, installation, maintenance and compliance — self-delivered, accountable, and evidenced across your entire estate. Let's talk.