24/7 Helpdesk & Reactive Response — 01698 480808
Case studies

Proof, not promises. Delivered.

A selection of live projects delivered by our own directly-employed M&E and mechanical teams — across schools, universities, care settings, logistics parks, hotels and occupied estates. Every one designed, installed, commissioned and certified in-house.

Home/Case Studies
Selected projects

The same accountable team, sector after sector.

From full building-services installations on new-build schools and healthcare facilities to precision mechanical works on occupied estates, the projects below show what single-source self-delivery looks like in practice — coordinated disciplines, one point of accountability, and a certified handover every time.

EducationCarnwath Primary School & Nursery
Primary & Nursery

Carnwath Primary School & Nursery

Full M&E building services — electrical, heating, ventilation, lighting and solar PV — delivered to an occupied-school programme.

Read the story →
EducationFettes College
Independent School

Fettes College

Electrical and mechanical installation for a prestigious independent school estate, delivered to heritage and high-spec standards.

Read the story →
EducationSt Patrick's
School

St Patrick's

School M&E building-services installation across electrical and mechanical disciplines, self-delivered end to end.

Read the story →
Higher EducationUniversity of Stirling — Pathfoot Building
University Campus

University of Stirling — Pathfoot Building

Electrical and mechanical services upgrade within a landmark university building, delivered in a live campus environment.

Read the story →
HeritageDavid Stow Building
Education / Heritage

David Stow Building

M&E installation within a significant heritage building, delivered to conservation-sensitive standards.

Read the story →
HealthcareDalkeith Extra Care Facility
Extra Care

Dalkeith Extra Care Facility

Full M&E building services — electrical, heating, care communications and life-safety systems for a care setting.

Read the story →
IndustrialBelgrave Logistics Park
Logistics

Belgrave Logistics Park

M&E installation for a large logistics development — power distribution, lighting and solar PV green-energy provision.

Read the story →
IndustrialFusion Assets
Regeneration

Fusion Assets

M&E building services supporting an industrial and commercial regeneration development.

Read the story →
ResidentialStraits Meadows
Residential Development

Straits Meadows

Heating, electrical and life-safety installation across multiple plots on a residential development.

Read the story →
HospitalityUrban Village Hotel, Aberdeen
Hotel, Aberdeen

Urban Village Hotel

Full M&E fit-out — electrical, mechanical, comfort cooling, fire and life-safety systems to hospitality standards.

Read the story →
Mechanical FMHeating pipework renewal at Thornwood Primary School
Thornwood Primary School

Thornwood Primary School

Heating pipework strip-out and renewal delivered entirely within the school's summer shutdown — flushed, refilled and recommissioned for term return.

Read the story →
Mechanical FMBoiler plant replacement at Woodside Library
Woodside Library

Woodside Library

Out-of-hours boiler plant changeover keeping heating and hot water live and the library open — new controls, commissioning and handover to our own maintenance.

Read the story →
Mechanical FMPlant room upgrade at Dalkeith Extra Care Facility
Dalkeith Extra Care Facility

Dalkeith ECF — Plant Room Upgrade

Ageing plant stripped out and replaced with new boilers, pumps, valves, pipework and controls — brought up to current standards with a full asset register.

Read the story →

Your estate could be the next case study.

Design, installation, maintenance and compliance — self-delivered, accountable, and evidenced from first drawing to final certificate. Let's talk about your project.

Call 01698 480808 Request a Callback