When the plant serving a live primary school failed, Stein Group mobilised on an emergency basis — installing two new 200kW Hamworthy boilers and a new commercial gas-fired water heater, with controls, gas, flue and pipework, back in service fast and fully certified.
Heating and hot water are non-negotiable in a working primary school — so when the plant serving Craigton failed, this became an emergency. There was no time for a drawn-out programme: the school needed its heating and hot water restored quickly, but properly, with new plant installed to current standards rather than a temporary patch. Stein Group mobilised its own mechanical team to replace the failed plant fast and close it out with full certification.
Working to an emergency timescale, the team installed two new 200kW Hamworthy boilers and a new commercial gas-fired water heater, connected up with new pipework, valves and a fresh control panel to run the installation reliably. Gas supply and flue arrangements were brought up to standard, and the plant room was set out as a clean, maintainable installation.
Despite the pace, nothing was cut short: the works were commissioned and certified on completion, so the school inherited new, standards-compliant plant with a properly evidenced installation — the basis for planned maintenance and compliance going forward.
Heating and hot water restored to the school on an emergency basis — two new 200kW Hamworthy boilers and a new commercial water heater installed, controlled, commissioned and certified, with a clean plant-room layout ready to be maintained and evidenced by Stein's own maintenance team.




Design, installation, maintenance and compliance — self-delivered, accountable, and evidenced across your entire estate. Let's talk.